
Build & Focus · Module 2 of 4
The MVP Line: What to Build First
Your product could ship six features and you have one launch to prove the bet. The candidates: the Core Loop (the aha itself), the Essential Input the loop runs on, the Basic Onboarding that gets a stranger to it, Polish, a Secondary Feature and Integrations. You drag the blocks onto a build timeline, order them, and plant the ship flag: everything left of the flag goes in v1. A proof meter fills as blocks land, a dashed PROVES IT line waits for the blocks it needs, and a learning clock dims every week the flag moves right. Then you launch, and two beats land: the viability line, where a cohort that cannot get through bounces and your proof counts for much less; and the decay, where everything past the line turns out to be learning you delayed. Four reflexes each tempt you. And the line itself moves, in both directions, when the world around the bet changes. Where do you plant the flag?
0 of 39 items completed0%~108 min remaining
Material · 39 items