Before you begin
- Time: about 30 minutes
- You will be able to: find a bottleneck from evidence, protect it, ration it, and set work-in-progress limits and batch sizes
- Goes deeper in: Capacity and Flow, and Lean and Flow

Lesson 01 · Section 1 of 2 · Reading
The first operations decision: where the constraint is, and how much work to let in.
Most operations problems show up as late work, long queues or overtime. Most of them trace back to flow: one step that cannot keep up, too much work started at once, or batches so big that work waits for the batch.
This part covers the decisions that fix flow.