Scheduling & Sequencing · Module 4 of 4
The Changeover Cost: When Switching Is Expensive, Group Your Work
The capstone reopens the course's first truth. Module 1 proved that on a single machine the order can't change when you finish — and that was right, as long as nothing was lost between jobs. Add a wash between ink colours and the truth inverts: on one press, six jobs finish anywhere from 18 to 27 hours depending only on order. The winning order is a shock: it's not a priority order at all — it's a grouping. Batch each colour (group technology) and run the blocks White→Red→blacK (washes 1+1=2) → makespan 18, the floor of all 720 orders. Shortest-first (25) and as-arrived (26) scatter the colours and pay for it. The replay flips the cheap direction with new equipment, proving the rule, not the memorized order, is the keeper. Course complete: the right order is rarely the fair, urgent, or most-important one — and sometimes it isn't a priority order at all, but a grouping.